Aside

Elara Completes 2020 Internship Program; Remotely!

Even with changes necessitated by the COVID-19 pandemic, Elara Engineering did not miss a beat as it recently concluded its highly sought-after 2020 Summer Internship Program which was conducted in a remote plus work environment.  With a creative mix of virtual learning sessions and presentations, meaningful online production work to move projects forward, and socially distanced, mask-required field work; four future engineers gained valuable insight, knowledge, and experience in numerous aspects of the MEP industry.  As in all of Elara’s previous summer internship programs, this year’s program was developed to ensure that interns become fully immersed in firm projects and engineering activities working alongside Elara’s multidisciplinary engineering design teams from June to August of this year.

During the 2020 summer, Elara’s interns performed field surveys to document existing site conditions, utilized Revit to support the preparation of engineering drawings, executed basic engineering calculations, and worked directly with Elara’s engineers to meet numerous project deadlines.  The Summer Internship Program also included a series of weekly presentations conducted by Elara Principals and managers as part of the Internship Training Program developed to introduce interns to the industry, learn about the company’s history and service offerings, gain insight into the MEPFPIT systems design process and potential career paths, and discuss numerous innovative projects completed by the firm.  Some specific presentation topics included HVAC 101, Elara Business Approach and Company History, Airside Systems, Team Introductions and project presentations by several Elara engineering teams, and a Panel discussion conducted by previous interns who now work at Elara as full time employees.

“Interning at Elara provided me a unique experience characterized by learning, opportunity, and autonomy.  It was great being welcomed by a team that values interdependence, allowing me to immediately become a contributing member to a multi-million-dollar project from my first day onward. The hands-on work that I engaged through 3D modeling and onsite, along with engaging presentations given by different teams of employees, exposed me to an industry that brings to life classroom theory.”

~Robert V., University of Illinois at Urbana-Champaign, Electrical Engineering

“This summer, I learned so much about Revit and MEFPIT systems. Despite, working remotely Elara managed to get me onsite for one of their projects a few times. Being onsite was eye-opening in the sense that it gave me a firsthand view on how what I construct in Revit becomes reality. Everyone, from beginning to end was been extremely supportive and great teachers to make sure I got a true understanding of whatever I was accomplishing that day.”

~Teagan J., Purdue University, Mechanical Engineering

During my summer at Elara I had the opportunity to work on the District 207 project. Elara did a fantastic job of communicating and keeping the intern program alive during these unprecedented times. This summer, the intern team and engineers taught me the ins-and-outs of electrical power distribution and lighting systems, as well as plumbing and drainage systems. Whether it was completing a Revit modeling task, taking notes in an intern presentation or team meeting, or going on site visits, I always had an engaging assignment to complete.”

~Miles V., Olivet Nazarene University, Architectural Engineering

“While interning at Elara over the summer, I was not assigned insignificant tasks and was able to work with the Electrical Team on multiple aspects of multiple projects. These tasks ranged from Revit, AutoCAD, placing light fixtures and fire alarm devices, circuiting, load calculations, and photometric calculations. I learned new aspects of engineering that can be applied to my desired job in the future and picking classes that could help me specialize in the area that I enjoy.”

~Manav T., Illinois Institute of Technology, Electrical Engineering

Elara is pleased to offer internships for aspiring engineers each summer with additional opportunities to engage students throughout the year. Resumes for internship consideration can be submitted to employment@elaraeng.com.

Aside

Elara Completes Design for Tribune Tower Adaptive Reuse Project

A Renewed Chicago Landmark
Working alongside architect Solomon Cordwell Bunez (SCB), Elara Engineering recently completed the MEPFP design for an adaptive reuse project that converted the iconic 34-story Tribune Tower and surrounding buildings into 162 luxury condominium units, while respecting the building’s Chicago landmark status.

Originally constructed in 1925, the Tribune Tower is one of Chicago’s most recognized historic landmarks.  In 1935, the Radio Building was added to the site, followed by the Television Building in 1950.  In 2018, the Chicago Tribune newspaper vacated the building and planning began to transform the site.

In addition to the conversion of the Tribune Tower, four additional floors will be added to the northeast side above the TV Building, providing a modern, glass complement to the existing limestone facades and creating a new elevated courtyard.  A full luxury amenity program will encompass several unique spaces, including a series of terraces at the tower’s crown that will give residents a one-of-a-kind experience beneath iconic, gothic buttresses.

Creative Solutions
As the project’s MEPFP engineer responsiblefor the design and installation of new major MEPFP equipment and infrastructure throughout the existing tower and addition; the depth of experience, creativity, and problem-solving ability of Elara’s team enabled the design to exceed the City of Chicago’s sustainability ordinance.  For example,

  • Elara identified the opportunity and confirmed reuse of the building’s existing emergency generator, ComEd vault, and existing chilled water plant that utilizes a river water condensing system.
  • Condominium units have smart thermostats with remote sensors and are served by four-pipe fan coil units installed in enclosures with ducted return and variable ventilation systems (including makeup air and toilet, kitchen, and dryer exhaust system) implemented throughout the building.
  • New direct digital control (DDC) designed to serve all major mechanical systems.
  • Car charging infrastructure designed to support entire garage.
  • To maximize indoor air quality, dedicated outdoor air systems use superior MERV-13 filtration, humidified air is provided throughout the property, residential ventilation is provided directly to each condominium unit to minimize the mixing of air, and self-regulating exhaust systems have been designed and installed.

Additional information about this and other Elara projects can be found here.

Aside

Water Seepage Solutions for Buildings Impacted by Elevated Lake Levels

Rising Water; Increased Seepage
Lake Michigan is reaching near record high water levels in 2020 and is regularly featured on local news due to related challenges of rising water levels. The reality for buildings located near Lake Michigan is an elevated water table resulting in increased amounts of water infiltration, also known as seepage, into underground spaces that are situated at or below the water table. Water seepage can occur through foundation walls and slabs on grade via cracks or holes that have formed over time and, in particular, at cold concrete joints where two or more concrete pours meet each other. Increased water seepage can result in problematic additional moisture within buildings and pooling of water in building interiors.

Underground spaces located below the water table experience water pressure on the back side of the concrete slab. When the water table is elevated, increased water levels and associated pressure will result in increased seepage where seepage previously existed as well as introduce seepage in weakened areas where seepage was previously not occurring.

Seepage Solutions
To counteract the increased water seepage, a de-watering approach should be developed and implemented to minimize water infiltration and impact to the building. Common de-watering measures include the installation of a pumping system dedicated to removing water from the backside of the building foundations, drain tile to collect water to be pumped away from the building, vacuum pumps, injecting cracks and holes, sealing concrete slabs, etc. Pumping solutions typically include a back-up power source to ensure the system remains operational during a loss of power. A combination of these and other measures may be required to combat seepage depending on a specific building’s conditions. In many cases, an initial investigative trial may be necessary to gather data before implementing a permanent de-watering solution.

Elara Engineering has designed de-watering systems applicable to below-grade spaces in existing buildings, including historic buildings, experiencing water seepage. We recommend, as a first step, an initial study to develop a de-watering solution that is applicable to a specific building and site which may include input from a structural engineer and experienced contractors as well as the building owner. A thorough understanding of the building’s specific conditions and requirements in addition to a well thought out design is vital to ensure maximum effectiveness of the de-watering measure(s) implemented.

For more information, please contact us at 708-236-0300 or info@elaraeng.com.

Aside

Elara Engineering Names Two New Associate Principals

Elara Engineering, Inc., is pleased to announce that Mr. Dustin Langille, BEMP, HBDP, LEED AP and Mr. Bhupendra Tailor, PE have been named as Associate Principals of the firm. The Associate Principal role in Elara reflects the commitment, passion, and technical and managerial abilities of these individuals specifically and the organization’s continued growth and need for additional leadership.

Mr. Tailor and Mr. Langille have been key contributors to Elara’s ongoing mission to provide big picture thinking, practical approaches, and sustainable designs to our valued clients and each delivers a different set of technical skills and abilities: Mr. Langille with
expertise in project management, indoor air quality and energy modeling for renewable energy systems, including geothermal, photovoltaic, and solar thermal design and Mr. Tailor with advanced expertise in electrical engineering, including medium voltage system, photovoltaic, and wind energy design. Both are driven by client satisfaction and an uncompromising commitment to understanding client needs, responsive and effective client communications, and detailed and accurate deliverables.
Learn more about each new Associate Principal here.

“Bhupendra and Dustin have both contributed to Elara’s success over the last decade and have consistently demonstrated the values required of future partners, consistently acting passionately in the best interest of our clients. Don [McLauchlan], Jay [Parikh], Brian [Malone], Caitlin [Levitsky], Matt [Swanson], and I are excited to have them as part of our leadership team. Please join me in congratulating Dustin and Bhupendra on their new roles and positions within Elara Engineering.”

~ Steve Maze, Elara President

Aside

MEPFP Retrofit Projects Improve Operational Flexibility and System Performance, Reliability, and Efficiency

In addition to a Dual Temperature System Study, Boiler & Chiller Plant
Schematic Design Report, and DHW Plant Replacement Report, Elara Engineering has completed the following MEPFP infrastructure retrofit projects for an occupied 39-story high-rise condominium building:

  • New Generator,
  • MUA Replacement,
  • FACP Upgrade,
  • Chiller Replacement,
  • Boiler Plant Replacement, and
  • Expansion Joint Replacement
  • New DDC System

Constructed in 1989, The Elm at Clark (1122 North Clark Street; Chicago, IL) includes a 6-level parking garage, sundeck, outdoor pool, and hospitality room within 396,000 square feet.

In addition to securing $82,539 from utility energy efficiency incentive programs to offset equipment installation costs and creating a project implementation prioritization plan that reduced overall project costs, Elara’s innovative engineering design team successfully provided the following to increase operational flexibility, improve occupant comfort, and enhance system performance, reliability, and efficiency:

  • New chiller plant, condensing boiler plant, and open protocol expandable building automation system
  • Enhanced dual temperature changeover control that significantly reduces changeover time between heating and cooling modes (from days to hours) aimed at improving occupant comfort while maintaining protection of new equipment.
  • New MUA incorporating a summer dehumidification mode.
  • New non-proprietary central fire alarm control panel (FACP) and devices with for less cost than replacing the existing proprietary FACP alone.
  • New expansion joints to proactively replace existing joints that were beginning to fail.

More information about this and other Elara projects can be found here.

Aside

Proactive Strategies to Restore Domestic Water in Buildings

 

Considering the current COVID-19 pandemic, buildings of various types have found themselves completely or partially inactive for extended periods of time. Given this condition, building owners, operators and managers should take precautions when restoring building occupancy   as it relates to domestic water systems.

Responsible plumbing design and various plumbing codes dictate the avoidance of ‘dead-end’ piping in domestic water distribution systems to avoid stagnant water. Stagnant domestic water creates the potential for growth of pathogens and other potentially harmful conditions. Buildings that have been unoccupied for any significant period of time can create a condition in which portions of the domestic water piping distribution system may contain stagnant water.

Common measures that can be taken to assist in delivering fresh water to the points of use throughout a facility are provided below:

  • Check with your local public health department for reopening requirements that may apply to domestic water in your facility type.
  • Survey the domestic water piping system and equipment to identify any leaks that may have developed during the period of extended inactivity. This is of particular importance for facilities with vintage galvanized piping.
  • Independently flush the domestic cold water equipment and piping system. All domestic water equipment and points of use should be flushed thoroughly and may require a review of the domestic water piping distribution system in the facility. Flushing should progress from the water service entry point towards the last point of use to ensure that all piping is adequately flushed with fresh water. . All strainers in the system should be repeatedly cleaned during flushing.
  • Drain and clean water storage tanks along with other potentially sensitive equipment throughout the domestic water system such as decorative fountains. Follow manufacturer recommendations and utilize cleaning products appropriate for domestic water equipment. Adequately flush the water storage tanks and other equipment after cleaning with fresh water. Refer to manufacturer recommendations for additional measures for specific equipment or points of use.
  • Independently flush the domestic hot water equipment and piping system utilizing a similar approach to the cold water.
  • Check the functionality of all domestic water equipment and components (i.e. pumps, heaters, storage tanks, water treatment, etc.). Change all filters utilized in the domestic water system. Exercise valves throughout the system and pro-actively replace valves that do not seat fully closed.
  • Perform water quality testing for areas of concern to identify if contaminants have developed during the period of inactivity. The confirmation of contaminants in the domestic water systems may require cleaning of the domestic water piping and the consultation of an industrial hygienist, engineer and contractor.
  • Maintain domestic hot water storage tanks at safe temperatures without creating a potential scalding hazard for building occupants.
  • Refill p-traps in floor drains, open site drains, etc.
  • Document all measures taken to create a facility standard for future reference.
  • Refer to resources such as the Environmental Protection Agency’s (EPA’s) “Maintaining or Restoring Water Quality in Buildings with Low or No Use” for more information.

Generally speaking, domestic water quality measures may not only be limited to significant periods of low or no usage. Normal facility operations can still include areas of stagnant water which should be managed as part of a regular maintenance plan. A water management plan for the facility should be created and updated on a regular basis.

Additional resources related to this topic include ASHRAE Standard 188, the CDC’s Water Management Plan Guidance, the American Industrial Hygiene Association Guideline, and the EPA’s WaterSense at Work.

For more information, please contact us at 708-236-0300 or info@elaraeng.com.

 

Aside

Strategies to Reduce Viral Transmission in Buildings

In light of the current COVID-19 pandemic, building owners and managers have increased their interest in HVAC strategies and products aimed at reducing the airborne transmission of viruses. While current research is limited on the specific characteristics of SARS-CoV-2 and its transmission, there is sufficient research on methods to help control  the transmission  of other infectious diseases.

For example, there are several strategies and products in the market today that are intended to reduce or remove pathogens from breathable air within buildings or systems. Many of these are supported by extensive research and practical experience while others employ new technologies with less substantiated data. Common strategies and products used today include:

  • Increasing ventilation (outdoor air) rates
  • Increasing air filtration effectiveness (MERV-13 or better)
  • Installing ultraviolet (UV-C) lights
    • In central air handling equipment
    • At upper room fixtures in the space
  • Implementing Bi-Polar ionization
  • Installing local exhaust and/or ventilation supply
  • Adding local filtration

These strategies can be implemented in new equipment/facilities or they can be retrofit in existing equipment/facilities.  Strategies may also be combined to amplify their effect or to address varying needs. The right solution for your facility will depend on many factors and there is currently no one-size-fits-all solution. A comprehensive plan should be developed that is suited for a building’s specific goals at individual space levels.

The implementation of HVAC strategies aimed at reducing the airborne transmission of viruses  within buildings should incorporate the following steps:

  1. Review Options: Working collaboratively with a professional engineer or industrial hygienist; identify, evaluate, and document potential virus mitigation strategies specific to the facility and its goals. These may include permanent or temporary measures which can be deployed now or in the future and may be part of a building re-opening plan under the current pandemic.
  2. Implement: Once options have been assembled and specific strategies selected, the professional engineer or industrial hygienist should prepare detailed specifications, assist in obtaining contractor pricing and review implementation by the successful contractor.
  3. Monitor and Adjust: It is important that after the implementation of any strategy, its resulting effectiveness and ongoing performance be monitored. This may include periodic testing of particulates or continuous monitoring through the building automation system and can vary widely based on the goals and strategies identified. Where actual performance is found to fall short of the desired thresholds, additional strategies can be implemented or controls adjusted to enhance performance. This monitoring and adjustment phase should be discussed and planned for as part of the initial options review.

Additional information regarding this topic is available through a recently released  position document prepared by the American Society of Heating, Refrigeration, and Air-conditioning Engineering (ASHRAE) which provides an overview of infectious disease transmission and previous ASHRAE research. The document can be found here.

For more information, please contact us at 708-236-0300 or info@elaraeng.com.

Aside

Associate Principals Matt Swanson and Caitlin Levitsky Co-Author: “Planning for MEP Infrastructure Projects in High-Rise Buildings”

Elara Engineering Associate Principal Matt Swanson, LEED AP, CEM and Associate Principal Caitlin Levitsky, LEED AP BD+C recently co-authored the above titled article placed as a featured story in the Spring 2020 issue of Chicagoland Buildings & Environments.

The heart of any building is its major mechanical, electrical, and plumbing (MEP) systems that allow the building to successfully operate and provide comfort to its occupants. However, when one or more MEP systems require repair or replacement, significant cost and inconvenience to building owners and occupants can occur. Mr. Swanson’s and Ms. Levitsky’s article provides a practical, proactive approach to plan and implement a large-scale MEP repair or replacement project in a high-rise building to minimize costs and disruptions.

Because of the many alternatives that exist for MEP system replacements, the potential for significant disruption and inconvenience to building occupants, and the associated high capital cost incurred to undertake these projects in high-rise buildings, the article recommends a variety of key elements to ensure that a project delivers the intended result and best value.

A reprint of Mr. Swanson’s and Ms. Levitsky’s article can be found here.

Aside

Evanston Energy Use Benchmarking Verification Due June 30th

Elara Engineering would like to remind our clients that the City of Evanston requires owners of commercial, residential and municipal buildings over 20,000 SF to track and verify (every third year by a professional) their building’s energy and water consumption using the Energy Star Portfolio Manager Tool. This includes apartment buildings, strip malls, schools, churches, hospitals, and  condominium buildings.  In addition, city-owned buildings, 10,000 SF or greater in size are required to comply.  It should be noted that condominium buildings 20,000 SF to 50,000 SF are exempt from the ordinance. The deadline to update and verify your building’s data is June 30, 2020. At this time, the deadline for compliance with the city has not been extended, however there is still time to complete benchmarking for this year.

More information about this city ordinance and required compliance actions can be found here. Additionally, Kelsey Dale from our Hillside office would be happy to answer any of your questions and assist in verification of your building’s data. She can be reached at 708.236.0300 x147 or kdale@elaraeng.com.

Aside

Medium Voltage Electrical Upgrades Completed for MA Center Chicago

Elara Engineering’s Electrical Team recently completed design efforts to improve the reliability of existing medium-voltage campus electrical systems, replace aged equipment, and create additional electrical capacity to accommodate the renovation of existing buildings and the construction of future facilities for the M.A. Center Chicago (MACC).

Located in Elburn, Illinois, MACC is a spiritual-based campus comprised of several existing buildings that were previously utilized as a boarding school. The campus includes a South Lodge, Gymnasium, Event Hall, Kitchen Building, Auditorium, Workshop, several small garages, and a water pump/treatment building. In addition to the renovation of existing buildings, a multi-year campus expansion is underway that includes new single-family townhomes, additions to the  lodge buildings and new Spiritual Hub,  Administration and Multi-Purpose Centers.

Elara’s work required close coordination with Commonwealth Edison to design a new 12KV campus infrastructure for building renovations and future additions. As a result, new medium voltage switchgear, transformers were installed to serve newly constructed townhomes and an administrative/multipurpose center, with another transformer installed at an existing substation building.  For the various buildings on the MACC campus, Elara’s work entailed the following:

  • Campus. Designed new medium voltage campus substation switchgear and associated campus distribution to existing building panelboards with capacity for new and future buildings.
  • Chalets, Villas and Townhomes. MEP schematic design and site lighting and related construction services for the new structures.
  • Kitchen, Gymnasium, and Event Hall Building. Replaced the existing panelboards in the kitchen, gymnasium and event halls fed from the campus substation switchgear. Designed new power distribution for the 28,000 square foot gymnasium and 10,000 square foot event hall. A new code compliant grounding system was also installed for each of the gymnasium and event hall buildings.
  • Water Tower. Designed a new code compliant power system that included a new panelboard, new transformer and associated wiring, including provisions for a future backup generator.

Additional information about this project and other Elara projects can be found here.

Aside

City of Chicago Benchmarking Verification Due June 1st

Elara Engineering would like to remind our clients that the City of Chicago requires owners of commercial, residential and municipal buildings over 50,000 SF to track and verify (every third year by a professional) their building’s energy consumption using the Energy Star Portfolio Manager Tool. The deadline to update and verify your building’s data is June 1, 2020. At this time, the deadline for compliance with the city has not been extended, however there is still time to complete benchmarking for this year.

 

More information about this city ordinance and required compliance actions can be found here. Additionally, Kelsey Dale from our Hillside office would be happy to answer any of your questions and assist in verification of your building’s data. She can be reached at 708.236.0300 x147 or kdale@elaraeng.com.
Aside

Elara Surpasses $6MM in Procured Incentives for Clients

With the successful procurement of $689,107 in incentives from Commonwealth Edison, Nicor, and Peoples Gas in 2019, Elara Engineering has now achieved a cumulative total of $6,122,050 of earned incentives since 2009.

Elara’s efforts to secure these incentives helps clients offset costs associated with the installation of energy efficiency improvements.  The Energy Efficiency Programs through ComEd, Peoples Gas, and Nicor offer non-residential Illinois customers a wide range of incentives for the installation of energy efficiency improvements and the purchase of energy efficient equipment.

Incentives are only awarded after a detailed application process and successful completion of the designed project.  Elara’s knowledgeable and highly experienced Incentive Procurement Team works closely with its clients and program representatives during the assessment and design phase of an energy project.  Specific application process components include:

  • Checks of project and equipment eligibility based on program guidelines,
  • Development, submittal and tracking of the pre-approval application,
  • Completion of the project design,
  • Reviews of the installation of selected equipment,
  • Submittal of the final application once the project is complete; including, required measurement and verification data for custom projects,
  • Meeting with program representatives at the job site for the final approval of the application, and
  • Verification of rebate check amounts.

Through its relationships with program representatives and with over a decade of participation in incentive program round tables and conferences, Elara has the ability to maximize the incentive amounts for our clients and streamline the incentive application and approval process.

 

Aside

Elara’s Plumbing Modifications Address Flooding at New Orleans Hotel

Due to repeated previous flooding, the potential for future flood events, and the location of critical building systems in the basement of the Pere Marquette Hotel, Elara designed numerous plumbing system modifications to minimize the potential impact of floodi ng on building operations and life safety.

The Pere Marquette Hotel, an 18-story luxury hotel located in the historic French Quarter of New Orleans was originally constructed in 1925, renovated in 2001, and underwent repairs to the base building after Hurricane Katrina in 2005.  The hotel property has 275 guest rooms, a restaurant, a café, a fitness center, banquet and conference facilities, offices, and a parking garage.

Elara’s project scope was coordinated with and reimbursed by the building owner’s insurance carrier with the intent to minimize future claims. This proactive approach included the implementation of the following measures:

  • Relocation of the building’s fire pump and major electrical infrastructure to the first floor
  • Replacement and consolidation of two booster pumps to one relocated to the first floor
  • Installation of larger storm water removal pumps, additional storm water removal pumps and the design of a de-watering solution to minimize the impact of the flooding including an additional pumping basin, drain tile, and a submarine door.

More information about this project and other Elara projects can be found here.

 

Aside

Elara Completes Boiler Plant Replacement and Chiller Plant Addition in 42-Story Condominium Building

Elara Engineering recently completed design and construction coordination to replace existing heating boilers and install new chillers  to serve 42-story occupied condominium building in Chicago.  Elara further secured $57,500 in utility incentive funding for the project and system replacements and upgrades are estimated to provide $46,500 per year of utility cost savings for the building.

The catalyst for the building upgrades was derived from Elara’s design report and review that identified and evaluated alternatives for improvements and/or replacement of the building’s existing boiler and chilled water plants.

New Boiler Plant. For this portion of the project, Elara designed and installed a new high-efficiency condensing boiler plant, hot water pumps with variable frequency drives (VFDs), and a new tube bundle in one of the building heating heat exchangers.  Ancillary work included new sump pumps, sealing the boiler room floor, and repairing and re-lining the boiler flue.

New Chiller.  Two additional water-cooled chillers were installed in the basement boiler room and sized for partial load of the building for system redundancy to facilitate repair or maintenance and increased operating efficiency.  Additional work included tying the new chillers into the existing chiller plant located in the building’s garage chiller room the installation of a new refrigerant detection and emergency exhaust system, and the refurbishment of the existing cooling tower including retrofitting new motors and VFDs on the cooling tower fans.

More information about this project and other Elara projects can be found here.

Aside

Elara’s Giving Season is All Year Round

Over the course of 2019, Elara Engineering volunteers participated in several philanthropic activities to support a variety of organizations and events.  By providing paid time-off to employees and matching individual monetary donations, Elara’s philanthropic program actively supports three key endeavors: to put others’ needs in front of our own, to provide opportunities to give back to our communities, and to build relationships with co-workers, neighbors, friends, and family.

Feed My Starving Children.  On Tuesday, February 26th, Elara volunteers stepped up to pack meals at Feed My Starving Children’s (FMSC) Schaumburg, Illinois facility.  The group helped produce 28,728 food packs which were packaged in 133 boxes for distribution to Djibouti, Africa; enough to feed 78 children for a year.

FMSC’s mission is accomplished through a simple process.  Donations are provided to fund meal ingredients, volunteers hand-pack the meals, and meals are then donated to FMSC food partners for distribution around the world.

Urban Roots Teen Docent Program.  For the Garfield Park Conservatory’s Urban Roots Teen Docent Program, Elara volunteers sweated it out on a hot Friday afternoon in June to prepare garden plots for use by program participants from nearby Al Raby High School.  Elara’s hard work included; weeding, amending soil, constructing compost bins, removing chicken wire, and other tasks.

The Urban Roots Teen Docent Program enables participating students the opportunity to grow and maintain their own gardens, lead visitors on tours, and engage in STEM lessons and labs related to plant biology and sustainability.

Camp Quality.  Responding to a last-minute need to help out at a no-cost summer camp for children ages 4 to 17 with a current or past cancer diagnosis, Elara volunteers rose to the occasion to run the camp’s ice cream tent for one of the open time slots.  On the evening of Thursday, August 8th, volunteers passed out ice cream, made milk shakes and sundaes, and encouraged kids to have a great week. 

Mutt Strut. On another sunny day on Saturday, September 7th, Elara volunteers participated in the Animal Care League’s annual Mutt Strut 5K Walk/Run held in Oak Park’s Maple Park to benefit homeless animals.  In addition to the 5K run and walk, the event included dog massages, pet contests, music, and food.  Elara’s participants either ran the 5K or helped cheer on participants on the racecourse.   In the end, over $10,600 was raised to directly support animals in need.

Operation Christmas Child.  Coming up on Wednesday, November 20th, for the second consecutive year, Elara volunteers will prepare and pack shoeboxes for Operation Christmas Child to provide children from around the world with gifts during the holiday season.  The event is sponsored by Samaritan’s Purse International Relief, an organization that helps meet the needs of people who are victims of war, poverty, natural disasters, disease, and famine.  As part of the effort, Elara volunteers form teams to coordinate, buy, and collect gifts based on Operation Christmas Child’s guidelines and then pack their gifts for shipment.  In 2018, Elara volunteers sent 46 boxes to children for the holiday season.

Additional information about the above organizations and programs can be found at the following links:

Aside

City of Chicago Implements Energy Rating System

In 2017, the City of Chicago created the Chicago Energy Rating System to improve the visibility and transparency of information required to be reported by building owners under the City’s 2013 Chicago Energy Benchmarking Ordinance.  As most of Elara’s clients already know, the Energy Benchmarking Ordinance requires large buildings located in Chicago (≥50,000 SF) to report energy use once per year, with additional data verification required every 3 years.

Under the new Chicago Energy Rating System, the first ratings were assigned between late August and mid-September 2019 for energy benchmarking reports that were due on June 1, 2019.  Now that the first ratings have been assigned, building owners will receive an initial six-month period within which they are required to post their Chicago Energy Rating Placard on site in a prominent location and begin sharing the rating at the time of listing for sale or lease.

How Chicago Energy Ratings are Assigned

Under the four-star rating system, four stars will indicate the highest energy performance while a one-star rating will indicate a poor energy performer.  Properties that have not submitted energy benchmarking information will receive zero stars.

Approximately 85% of buildings that report their data receive a 1-100 ENERGY STAR score from the Portfolio Manager energy benchmarking software.  These buildings will, based on their 1-100 ENERGY STAR score, receive between one and four stars on the four-star Chicago Energy Rating System.  Buildings with one, two, or three stars will be able to earn an additional star if they have improved by at least 10 points in the past two reporting years.

Approximately 15% of the reporting properties that are not eligible to receive a 1-100 ENERGY STAR score.  These properties will receive an energy rating based on the building’s source energy use intensity (EUI), which is energy use per square foot, in comparison to national medians for properties of similar size and type. The lower the percentile for Source EUI, the better, as a lower EUI indicates less energy use per square foot.  In these cases, the Chicago Energy Rating will be based on the following scale:

  • 1st to 25th percentile for Source EUI: 4 Stars
  • 25th to 50th percentile for Source EUI: 3 Stars
  • 50th to 75th percentile for Source EUI: 2 Stars
  • Above the 75th percentile for Source EUI: 1 Star
  • Any building with one, two, or three stars with a 10% improvement in the past 2 years earns an extra star

What Building Owners Need to Do

  • Ensure compliance with the reporting requirements under the City of Chicago Energy Benchmarking Ordinance.
  • Make sure you have received your Chicago Energy Rating Placard which were to be mailed by mid-September 2019.
  • Post your Chicago Energy Rating Placard and begin sharing – on an ongoing basis — your rating at the time of listing for sale or lease within the initial six-month grace period.

Additional information about the Chicago Energy Rating System can be found here.

Aside

Elara’s Matt Swanson Publishes Article: “Proactive Energy Cost Reduction on the Rise in Chicago High-Rise Buildings”

Elara Engineering Associate Principal Matt Swanson, LEED AP, CEM has had the above titled article placed as the cover story in the Autumn 2019 issue of Chicagoland Buildings & Environments.

The article presents the proactive approach taken to lower energy costs at the existing 474 North Lake Shore Drive high-rise condominium building located in the Streeterville neighborhood of Chicago.  Elara’s forward-looking approach implemented over several years by the 474 North Lake Shore Drive Condominium Association resulted in a 23% reduction in relative energy costs since 2007; a savings of $127,930 annually.

Beginning with Elara’s 2008 energy audit, the building’s Condominium Association maintained a constant focus on the energy performance of their building and continuously implemented energy conservation recommendations identified in the 2008 audit report, and subsequent reports in 2011 and 2015.

Consistent with Elara’s recommended strategy, projects that addressed “low hanging fruit” such as controls and VFDs that have a short-term payback and reduce the overall load of the building systems, were implemented first.  This strategy paid dividends during a 2016 chiller plant replacement.  Reduced demand of end-user systems (e.g., AHUs, exhaust fans, etc.) from previously recommended energy efficiency projects allowed for the installation of new chillers that were smaller in capacity; resulting in both lower initial and operating costs.  The associated savings allowed the Condominium Association to fund other energy efficiency upgrades.

In total, all of Elara’s recommendations that were implemented represented an incremental cost of $900,000 with a payback of less than 10 years.  Additionally, $58,275 was obtained through utility incentive programs to assist in funding the projects as a result of the energy efficiency improvements implemented.

A reprint of Mr. Swanson’s article can be found here and more detailed information about Elara’s 474 North Lake Shore Drive Project can be found here.