Project Highlights and Results
- Engineering design to address critical needs (Priority 1) and to preserve existing equipment (Priority 2), included:
- Installation of new direct digital control (DDC) system
- Modifications to existing air handling systems (including equipment refurbishment)
- The addition of reheat coils to reduce infiltration
- Computer Room supplemental cooling
- Conversion of existing hot water pumps to variable
- Replacement of AHU condensing units, coils and piping.