PHARMACEUTICAL/HEALTHCARE
Whether a campus, single building or specialized facility, Elara empowers healthcare organizations to provide a comfortable environment for patients, visitors, and healthcare professionals through innovative, energy efficient, sustainable MEPFP solutions that seek to lower energy and operating costs.
Advocate Trinity Hospital Medical Office Building, Chicago IL
- Energy Audit identified three ECMs with a combined annual utility cost savings of $96,000
Bethany Methodist Hospital, Chicago IL
- Replaced existing absorption chillers with new high-efficiency electric chillers
- Upgraded electrical service and infrastructure
Cadence Health Delnor Community Hospital Medical Office Building, Geneva IL
- Ventilation review revealed outdated ventilation system that had not been adapted to meet the building’s needs
- Installed a new energy efficiency MAU in an alternate location while building was fully occupied
Loyola University Heath Science Campus, Maywood IL
- 11 healthcare buildings; 4 educational buildings
- Achieved $177,200 in utility incentive funding
- Achieved installed CHW cost of approximately $850/ton by reusing existing infrastructure
- Avoided >$1MM in construction cost for new translational research building.
Loyola University Medical Center Dialysis & Physical Therapy Center, Maywood IL
- Generator schematic design report
- Installed new back-up generator system
Loyola University Center for Translational Research Education
(CTRE), Chicago IL
- LEED Gold Designation
- Peer Review and LEED Enhanced Commissioning
- State of the art laboratory and research building
Passavant Area Hospital, Jacksonville IL
- Identified and implemented Multiple Energy Conservation Measures
- No shut down of systems during construction
Saint Joseph Nursing Home, Springfield IL
- Designed electrical infrastructure to accommodate the use of a remote, temporary generator
- Intended to support the operation of cooling equipment during a power outage
Waukesha Memorial Hospital, Waukesha WI
- Third party commissioning of laboratory addition to the existing hospital
- 100% verification of design specifications