2026 Chicago Code Changes – Plumbing

Most professionals in the Chicago construction industry are aware that the City of Chicago made significant code updates this year (mechanical, energy, fire prevention, etc.). Professionals and clients should review those code updates to help ensure they are up to speed regarding potential impacts to their projects. What many are unaware of however, is the enactment of several specific updates to the City of Chicago Plumbing Code. Below is a summarized version of the major updates that affect many Elara clients. 

1.18-29-604.2 System Interconnection

  • At the points of interconnection between the hot and cold water supply piping systems and the individual fixtures, appliances or devices, check valves shall be installed or other provisions shall be made to prevent flow between such piping systems.

Elara’s interpretation of the above code update is to help minimize ‘crossover’ within domestic cold and hot water systems to help ensure efficient delivery of hot and cold water to plumbing fixtures. Crossover is when the cold water back feeds into the hot water piping or the hot water back feeds into the cold-water piping at a point of system interconnection. Crossover is typically a difficult item to diagnose, particularly in high rise type buildings.

2.18-29-604.8 Water Pressure Reducing Valve or Regulator

  • Where water pressure within a building exceeds 80 psi (552 kPa) static at any fixture or outlet, an approved water pressure reducing valve conforming to ASSE 1003 with strainer shall be installed to reduce the pressure at any fixture or outlet in the building water distribution piping to 80 psi (552 kPa) static or less.

3.18-29-604.10.1.3 Available Pressure

  • In determining the available pressure to overcome friction in the piping system, head meter and other losses shall be deducted from the minimum available pressure source. When the pressure exceeds 80 psi (552 kPa) at any plumbing fixture, the pressure shall be reduced by an approved type reducing valve. The minimum size of fixture supply pipes is shown in Table 18-29-604.5.

Elara’s interpretation of the above two code updates is to bring the Chicago Code into alignment with International Code. This will heavily impact projects where piping is replaced in high rise buildings as pressure zones are more likely to require modification to comply with current code. This will have a significant effect on project complexity and budgets.

There are several other code changes that we recommend be reviewed pertaining to: dead end definition, building drain test, waste connections for laundry and dishwashers, waste pipe sizes, shut off valves at domestic hot water tanks and relief valve approval.

Note: projects can submit for permits (and have a check cleared) before December 1st of 2026 to avoid complying with the code updates. Where appropriate, your project should pursue this permit grace period to avoid additional complexities and budget increases.

Additional information for the code updates can be found on the City of Chicago website.

Related News

BIG PICTURE THINKING.

Each project is unique, and we start with an open mind.

PRACTICAL APPROACH.

We look at things differently – because we can.

SUSTAINABLE DESIGN.

Sustainable designs for sustainable results: the ultimate goal.