NU 345 E. Superior & McGaw Pavilion MEP Upgrades

ADDRESS: 345 East Superior Street, Chicago, IL, USA
BUILDING TYPE: 345 E Superior: Office and Outpatient Health Services McGaw Pavilion: Medical education (surgery classrooms and research labs) plus shared space with Northwestern Memorial Hospital (dialysis clinic, outpatient surgery, ICU)
TEAM / TEAM LEAD: Dustin Langille
TEAM / TEAM LEAD: Dustin Langille, Bhupendra Tailor
ELARA ROLE: MEP Engineer

Project Highlights & Results

  • Based on an Elara MEPFP infrastructure and opportunity assessment report with the goal of sustaining occupancy for the buildings over the next several years.
  • Implemented numerous infrastructure and energy related modifications identified in Elara’s opportunity assessment including the following for 345 E. Superior:
    • Cooling Tower refurbishment
    • New fire alarm system
    • VFD replacements
    • AHU Damper replacements
    • Reducing airflow for unoccupied spaces
    • Replacing 3-way control valves with new modulating control valves
    • Replacing light fixtures
  • Implemented numerous infrastructure and energy related modifications identified in Elara’s opportunity assessment including the following for McGaw Pavilion:
    • Refurbishing existing lab AHUs
    • Replacing VFDs for lab AHUs and exhaust fans
    • Replacing specific lab AHU systems
    • Replacing light fixtures
    • Updating electrical single-line as-built drawings

Additional Details

BIG PICTURE THINKING.

Each project is unique, and we start with an open mind.

PRACTICAL APPROACH.

We look at things differently – because we can.

SUSTAINABLE DESIGN.

Sustainable designs for sustainable results: the ultimate goal.