Project Highlights & Results

  • Retro-Commissioning project that identified necessary repairs and the opportunity
    to reuse existing major equipment and reconfigure building control system in lieu of
    costly replacement
  • 11% normalized electrical energy savings and 29% natural gas energy savings
    which translates to more than $20,000 in avoided annual utility costs since retro-commissioning
  • Substantial costs avoided through reuse of existing equipment and reconfigured
    existing controls system which extended useful service life of equipment

Additional Details

BIG PICTURE THINKING.

Each project is unique, and we start with an open mind.

PRACTICAL APPROACH.

We look at things differently – because we can.

SUSTAINABLE DESIGN.

Sustainable designs for sustainable results: the ultimate goal.