Loyola University Lake Shore Campus Steam Plant

building
ADDRESS: Steam Plant, Chicago, IL 60626, USA
BUILDING TYPE: Campus, Higher Education
TEAM / TEAM LEAD: Don McLauchlan
TEAM / TEAM LEAD: Don McLauchlan, Brian Malone, Matt Swanson
ELARA ROLE: ME + Controls

Project Highlights & Results

  • Approximately $966,000 in estimated annual cost savings.
  • Additional savings gained from avoided replacement of
    underground steam piping.
  • Three combined boiler plants constructed under budget
  • Approximately $240,000 in incentive funding obtained from Peoples
    Gas through Elara’s efforts.
  • Less than 4-year project payback.

Additional Details

BIG PICTURE THINKING.

Each project is unique, and we start with an open mind.

PRACTICAL APPROACH.

We look at things differently – because we can.

SUSTAINABLE DESIGN.

Sustainable designs for sustainable results: the ultimate goal.