Design utilizes existing campus chilled water for cooling and new high efficiency
boiler plant for heating
Two custom air handling units provide ventilation and space conditioning; one for
first and third floor offices and public spaces, the other providing 100% outside air
for second floor locker rooms and restrooms
100% outside air unit equipped with heat exchanger and re-heat heat exchanger