10-Year Capital Study; Maintenance RFP; Energy Audit; Tenant Kitchen Exhaust Study; Garage Sprinkler System Replacement; Maintenance RFP

ADDRESS: 540 N State St, Chicago, IL 60654
TEAM / TEAM LEAD:
TEAM / TEAM LEAD: Steve Maze

Project Highlights & Results

Additional Details

BIG PICTURE THINKING.

Each project is unique, and we start with an open mind.

PRACTICAL APPROACH.

We look at things differently – because we can.

SUSTAINABLE DESIGN.

Sustainable designs for sustainable results: the ultimate goal.