Dunklin R-V School District

red building
ADDRESS: 497 Joachim Ave, Herculaneum, MO 63048, USA
BUILDING TYPE: K-12
TEAM / TEAM LEAD:
TEAM / TEAM LEAD:
ELARA ROLE: MEPFPIT Engineering Design

Project Highlights & Results

  • New upgraded HVAC Systems for 3 schools
  • Taylor Early Childhood Center
    • Replaced through the wall HVAC units with new AHUs
    • Domestic hot and cold water piping replacement
  • Senn Thomas Middle School
    • New gymnasium AHUs with duct sock distribution
    • New zoned locker room and office AHU system
    • New high efficiency gymnasium lighting
  • Pevely Elementary School
    • Replaced multizone AHUs with new RTUs
    • Zoned temperature control
    • New high efficiency condensing boiler plant
    • Conversion to primary-secondary piping configuration

Additional Details

BIG PICTURE THINKING.

Each project is unique, and we start with an open mind.

PRACTICAL APPROACH.

We look at things differently – because we can.

SUSTAINABLE DESIGN.

Sustainable designs for sustainable results: the ultimate goal.