
Loyola University Lewis Tower
Project Highlights and Results
- Identified and evaluated alternatives to replace 228 PTAC units
- In-depth survey needed to create vertical paths for new DOAS infrastructure and confirm above ceiling conditions for ductwork
- Replacement design includes new water cooled Variable Refrigerant Flow (VRF) system
- Phased design approach allowed building occupancy throughout construction
Click here to view the full project profile