Passavant
Passavant Area Hospital, Jacksonville IL

Project Highlights and Results

  • Identified and implemented Multiple Energy Conservation Measures
    • Upgraded chilled water system
    • Upgraded sections of existing air handling system
    • Converted air handling systems from constant volume to variable operation
    • Recommissioned HVAC control system
  • No shut down of systems during construction
  • Permitted through the Illinois Department of Public Health (IDPH)
to top button