Cadence Health Delnor Community Hospital Medical Office Building, Geneva IL

Project Highlights and Results

  • Ventilation review revealed outdated ventilation system that had not been adapted to meet the building’s needs
  • Installed a new MAU in an alternate location while building was fully occupied
    • New, larger equipment was located on the roof
    • Existing ductwork reused and connected to the new MAU riser as construction proceeded from the top down (resulting in no downtime to occupants)
    • New MAU equipped with heat recovery
    • New building automation system installed